Mining Waste Permit

Initial Submission
2. Springs Road Exploration Wells – NTS Final 2016-01-12
3. IGas ISO Certificate 14001{2}9001 – Renewal
3. IMS.E.002 – Integrated Management System – 03 – 28{2}08{2}2015
3. IMS.MN.001 – Integrated Management System Manual – 04 – 07{2}09{2}2015
4 Waste Management Plan
4.0 Springs Road Exploration Wells – WBM – WMP Final 2016-01-12
4.1 Appendix A – Springs Road 01 fluids summary 2016-01-12
5 2a SCR Appendix B Envirocheck
5 2b SCR Appendix B Envirocheck
5.0 SCR Springs Road Exploration Wells
5.0 Springs Road Exploration Wells – ERA Final 2016-01-12
5.1 ERA Appendix A Noise Assessment
5.1 SCR Appendix A Non Tech Summary 27 10 15
5.2 ERA Appendix B Dust Management Plan
5.2 SCR Appendix B Envirocheck
5.3 ERA Appendix C Lighting Assessment
5.3 SCR Appendix C MAGic Report
5.4 ERA Appendix D Final 2016-01-11
5.4 SCR Appendix D Ground Investigation
6.0 SCR Springs Road Exploration Wells
6.0 Springs Road Exploration Wells – ERA Final 2016-01-12
6.1 ERA Appendix A Noise Assessment
6.1 SCR Appendix A Non Tech Summary 27 10 15
6.2 ERA Appendix B Dust Management Plan
6.2 SCR Appendix B Envirocheck
6.3 ERA Appendix C Lighting Assessment
6.3 SCR Appendix C MAGic Report
6.4 ERA Appendix D Final 2016-01-11
6.4 SCR Appendix D Ground Investigation
7. Springs Road HRA-2016-01-12 Combined
8.1 Drawing 1 Site Location
8.2 Drawing 2 Permit Boundary
8.3 Drawing 3 Development Plan
8.4 Drawing 4 Existing Site Layout
8.5 Drawing 5 Proposed Site Layout (Site Development)
8.6 Drawing 6 Indicative Site Layout (Operational)
8.7 Drawing 7 Proposed Site Drainage Layout
8.8 Drawing 8 Proposed Site Entrance & Sightlines

After Schedule 5
4.0 Appendix A – Springs Road 01 fluids summary Rev 2 2016-04-12
4.0 Springs Road Exploration Wells – WBM – WMP Rev 2 Issue 2 – 2016-04-21
5.0 Springs Road Exploration Wells – SCR Rev 2 2016-04-12
6.0 ERA Appendix B Final Rev 1 Schedule 5 2016-03-07
6.0 Springs Road Exploration Wells – ERA Rev 2 2016-04-12
7.0 Springs Road Exploration Wells – HRA Rev 2 – 2016-04-12
8.9 Drawing 9 – Proposed Site Elevations & Sections (Phase 1)
8.10 Drawing 10 Regional Monitoring Locations

EA Decision
Decision Document
Issue Letter
Misson schedule 5 notice AMENDED 160216
PERMIIT